Sunday, 21 March 2010

Comparing the response

As promised here is a quick stats check with respect to the level of response to previous consultations for the area:


  • Inverness Local Plan (ILP); consultative draft, THC June 2001 – representations received over a 12 week period with 800 individual responses on 2000 issues, then in
  • April 2002 Inverness Area Committee had 3rd of three advisory meetings with respect to the responses to the ILP - as noted above. Cannot now locate the minutes of these specific meetings on THC web pages. (I made notes of these meetings a few years back)
  • Just over 50 written representations to the PDET committee for their consideration on 17/08/05, but the focus was on the conclusions reached by the consultants regarding the centre of the A96 Corridor rather than East Inverness or Nairn.
  • Appendix 2 (click here) of the report to committee on 14/03/07 shows the degree of response to the A96 Corridor consultation with 158 representations listed.


No comments:

Post a Comment